Third-party factory evidence

Malaysia BBQ briquette charcoal factory inspection

A buyer-focused summary of the 2025 Control Union inspection report for Bio Green Technology Sdn Bhd, documenting factory capacity, production equipment, storage, weighing, records, and quality-control practices.

Malaysia BBQ charcoal factory inspection overview
800 MT
Maximum monthly briquette capacity
12
Briquette machines
72
Carbonization kilns
26,000 sq ft
Storage area

What was inspected?

Control Union (Malaysia) inspected the Pagoh, Muar, Johor facility on 16 October 2025. The report covers company records, production flow, machinery, storage, weighing, finished goods, safety controls, and certification evidence.

What production capacity is documented?

The inspection records a maximum briquette charcoal output of 800 metric tons per month, supported by 12 briquette machines, 72 carbonization kilns, grinders, a dryer, forklifts, cranes, and an 80 MT weighbridge.

How is quality controlled?

The factory keeps daily production, weight, density, incoming raw material, and outgoing goods records. The report also notes moisture testing, metal detection, dust-control systems, and SGS laboratory testing several times per year.

What does this mean for buyers?

For importers and distributors, the report turns a supplier claim into evidence: a named factory, a dated inspection, documented equipment, monthly capacity, storage space, weighing control, and traceable production records.

Inspection Photo Evidence

Aerial view of the Malaysia BBQ charcoal factory site
Factory and production site
Raw material processing and grinding line inside the charcoal factory
Grinding and preparation
Briquette charcoal loading at the carbonization kiln area
Carbonization kilns
Moisture testing for briquette charcoal quality control
Quality checks

Use the report in your supplier evaluation

Share your destination market, monthly volume, packaging format, and documentation requirements. We will respond with the relevant product basis and available supporting evidence.

Start Supplier Evaluation